Hello there! We are conducting a survey to better understand the user experience in making a first edit. If you have ever made an edit on Gamepedia, please fill out the survey. Thank you!

Large Boiler (GregTech 6)

From Feed The Beast Wiki
Jump to: navigation, search
This page is about the Large Boiler multiblock from GregTech 6. For other uses, see Large Boiler.
Large Boiler





ModGregTech 6
TypeMultiblock structure
Technical details
First appearance6.05.09

The Large Boiler is a 3x4x3 multiblock steam boiler added by GregTech 6. It accepts Heat Units (HU) from the bottom faces, water or distilled water in the lower layer of walls, and emits steam via five 'pipe holes' in the center of its sides and top.

Recipe[edit | edit source]

Construction[edit | edit source]

In addition to the Main Barometer, a Large Boiler requires:












































































































































Usage[edit | edit source]

Main article: Steam Boiler Tank

A boiler has a fixed heat consumption rate and a fixed steam production rate. Steam production will be reduced by calcification unless Distilled Water is used. Calcification can be viewed with a Magnifying Glass and will never exceed 50%. To allow for pipes being unstable, the steam emission rate will double at 75% pressure.

Material HU in steam out
Stainless Steel 4096 8192
Invar 4096 8192
Titanium 8192 16384
Tungstensteel 16384 32768
Adamantium 131072 262144

The heat input is a total across all nine bottom faces. Steam output is shared between the five pipe holes. It would be balanced if all five were running freely, but backed-up, restricted, or disconnected pipes will draw less, leaving more to be shared by the connected pipes.

Trivia[edit | edit source]

There was also a sixth type of large boiler in the early version, the large tungsten boiler, which has been removed since.

In the early version, the top center of large boilers can not be sealed.

At present (6.10.01, Jan 2019), the largest pipe can carry 12000L/t; even with five extenders, this is insufficient to drain the Adamantium Boiler - it must be directly attached to (a) Multiblock Steam Turbine(s).